Problem:

Large manufacturer was struggling with fluctuating workloads, and ability to design and engineer new products.

It was identified that their existing staff were of better value providing internal project management tasks.

Solution:

Trang was able to provide a dedicated and experienced design team to assist the client.

The design team generated effective and timely drawings, streamlined processes and the internal management of drawings.

Outcome:

  • Design lead time reduced from around 2 weeks, to 2 days
  • Reduced duplicate engineering costs by streamlining drawings
  • Reduced manufacturing costs by streamlining parts
  • Allowed client to focus on sales & product delivery